Ground-Up Single-Family · Infill Lot

In construction · Roof on

  1. 01

  2. 02

  3. 03

  4. 04Construction

  5. 05

Jones Street — current progress on site

01

The project

A new-construction home on a tight infill lot near downtown Greenville. Foundation poured in August, framed and wrapped in September, roof deck on. Built to sell.

Jones Street is a ground-up, roughly 1,850 square-foot home — three bedrooms, two and a half baths, and an office — on a constrained infill lot close to downtown Greenville. The lot's floodplain line and setbacks decided the building envelope before an architect drew a line, so the plans were redrawn to fit the dirt rather than the other way around. The project sits in its own single-purpose entity with a committed senior construction loan and a joint-venture equity partner, and it is designed for a fast build cycle to a for-sale exit.

01
≈1,850 SF · 2 stories
02
3 bed · 2.5 bath · office
03
Front porch + rear screened porch
04
Infill lot, walkable to downtown Greenville

02

From site to structure

What we started with

August 2026 — block foundation on the infill lot
photoAugust 2026 — block foundation on the infill lot

What we're building

Front elevation — rendering
renderingFront elevation — rendering

03

Progress

  1. Spring 2026

    Lot under contract, plans redrawn to the site

    Floodplain and setbacks set the envelope; stock plans didn't fit, so the drawings were reworked to match the lot.

  2. June 2026

    Construction loan closed

    Senior construction financing closed and the JV entity finalized.

  3. August 2026

    Foundation

    Block foundation walls up.

    Jones Street, August 2026: Foundation
  4. September 2026

    Framed, wrapped, roof decked

    Second floor framed and house-wrapped; trusses set and the roof decked.

    Jones Street, September 2026: Framed, wrapped, roof decked
  5. Late September 2026

    Roof shingled

    Shingles on. Next come windows and doors to close the house in.

    Jones Street, Late September 2026: Roof shingled

04

How it's structured

  • Single-purpose entity
  • Senior construction loan
  • JV equity partner
  • For-sale exit

Offered only to verified accredited investors under Rule 506(c). See the investor portal for offering documents.

05

What comes next

  1. 01Windows and exterior doors (dry-in)
  2. 02Rough-ins (electrical, plumbing, HVAC)
  3. 03Exterior and interior finishes
  4. 04Target completion: winter 2026

Next stage: Complete